Get a Quote
Dairy Production Line
Production Line Solution

Dairy Production Line

Dairy production depends on controlled water quality for processing, equipment rinsing, CIP and plant utilities. PXHX can integrate a dairy water treatment system with the processing, filling and packaging sections according to raw-water conditions, required water use and production requirements.

Process Water & Utilities

Dairy Water Treatment System for Dairy Processing

A dairy water treatment system prepares incoming water for the uses required inside a dairy plant, such as process or product-contact water, equipment rinsing, CIP, boiler or steam utilities, cooling and general cleaning. The treatment train should be selected from the raw-water analysis and the quality required at each point of use rather than from a fixed equipment package.

Water Requirements in Dairy Processing

A water for dairy processing treatment system must account for more than total plant flow. Water used for product contact, cleaning, CIP and utilities can have different quality requirements. Source-water hardness, turbidity, dissolved solids, iron or manganese, and microbial control requirements can all change the process design.

Typical Treatment Process

The exact process varies by site. A typical design may combine pretreatment and filtration with membrane treatment or disinfection where required. PXHX recommends confirming the treatment sequence only after reviewing the raw-water report and the intended use of the treated water.

Raw Water → Pretreatment → Filtration → Membrane Treatment Where Required → Disinfection → Storage / Process Water Supply

Water Treatment Equipment

Depending on the application, the system can be evaluated with media filtration, reverse osmosis, ultrafiltration, nanofiltration, UV or ozone treatment, storage and CIP-related equipment. Not every dairy project requires every stage; configuration should follow the actual water analysis and plant requirement.

Water Treatment by Dairy Plant Application

Water Use Main Design Consideration What to Confirm Before Selection
Process / product-contact waterRequired water quality and consistencyRaw-water report, intended use and required flow
CIP and equipment cleaningHardness, consistency and cleaning requirementsCIP demand, operating schedule and water quality target
Boiler / steam utilitiesScale-forming minerals and feed-water requirementBoiler specification and incoming-water hardness
Cooling waterScale, fouling and operating conditionsCooling system design and makeup-water requirement
General plant waterSource-water quality and intended useDaily consumption, storage and distribution points

Dairy Wastewater and Water Reuse Considerations

Dairy production and CIP activities also generate wastewater. Treatment or reuse requirements should be evaluated separately from the incoming-water system because the correct process depends on wastewater characteristics, discharge requirements and the intended reuse. For projects that include this scope, see PXHX Sewage Treatment equipment and confirm the wastewater analysis before system selection.

Before You Specify

Five Things That Decide Your Configuration

Most quotation revisions come from one of these five being unclear at the start. Settling them early gives you a proposal you can actually compare.

Raw-water analysis and dairy water treatment

The dairy water treatment system should start with a recent laboratory analysis of the incoming water and the quality required for processing, cleaning and utilities. Turbidity, hardness, dissolved solids, iron or manganese and other source-water conditions can change the pretreatment, membrane and disinfection requirements. Without the analysis, the treatment train and budget can only be estimated.

Bottle size range, not just one size

A line quoted for 500 ml will not automatically run 350 ml and 1.5 L. Tell us every size you intend to produce and the expected split between them, so change parts, star wheels and label sizes are included from the start rather than added later.

Label type

Sleeve, BOPP hot-glue and roll-fed labels use completely different machines and consumables. Sleeve gives full-body decoration at higher material cost; BOPP hot-glue runs faster with lower running cost. Choosing after the line is built means replacing a machine.

Real operating hours

A 12,000 BPH line running 8 hours produces less than a 6,000 BPH line running 20 hours, at a much higher capital cost. Working backwards from your monthly volume and shift pattern often points to a smaller, better-utilized line.

Destination electrical standard

Voltage, frequency and plug standards vary by country. Confirm the destination early so motors, control cabinets and protection devices are built to the correct standard rather than modified on site.

Room to grow

If you expect to add a second line or a juice line within a few years, the water treatment capacity, utility headers and workshop layout should be planned for it now. Retrofitting a treatment room is far more expensive than oversizing it at the start.

Plant Requirements

What Your Building Needs to Provide

Send us these six items and we can produce a CAD layout with equipment positions, utility routing and product flow.

  • Workshop dimensionsLength, width and clear ceiling height, with column positions marked
  • Power supplyVoltage, frequency, phases and available capacity in kW
  • Compressed airBlow molding needs high-pressure air; low-pressure air runs the pneumatics
  • Water supply & treatmentSource water, daily volume, recent laboratory analysis, required process-water quality and estimated CIP demand
  • Steam or hot waterRequired for CIP; boiler capacity if already installed
  • Drainage & floorFloor drains, slope and load-bearing capacity of the slab
Request a Layout Drawing
Line FAQ

Questions From Buyers

Specific to this production line. General company questions are answered on the about page.

Ask Our Engineers
Q1: What dairy products can this line produce?

It can handle pasteurized milk, UHT long-life milk, yogurt, cream, condensed milk, fruit dairy beverages and other liquid dairy products.

Q2: What capacity range is available?

Custom capacity from 500 L/H up to 20,000 L/H. We design according to your daily output and working shifts.

Q3: What packaging formats does it support?

Carton, PET bottle, plastic cup. Different fillers for different package types.

Q4: What sterilization options can you provide?

Pasteurizer for fresh dairy (refrigerated shelf life); UHT sterilizer for ambient long shelf-life products.

Q5: What water treatment system is used in dairy processing?

The system depends on the incoming-water analysis and the required use of the treated water. A dairy project may use pretreatment and filtration, with RO, UF, NF, UV or ozone treatment where required. The final sequence should be selected for the actual source water, process-water target, CIP demand and plant utilities rather than from a fixed standard package.

Q6: Does the line support CIP or SIP?

Full CIP is standard. SIP (Steam-In-Place) is available as option for UHT and yogurt process

Q7: What raw milk parameters do you need for design?

Raw milk fat, protein, pH value and full raw milk analysis report

Q8: How is water treated for dairy processing?

Water treatment normally starts with the raw-water report and the intended point of use. Pretreatment can address suspended solids or source-water conditions, while membrane treatment and disinfection can be added when the required process-water quality calls for them. CIP, boiler, cooling and product-contact uses should be reviewed separately because they may not need the same water quality.

Q9: Can we change package size on the same line?

Yes, multi-size compatible. Quick changeover parts are supplied for different volumes.

Q10: What utilities are required on site?

Steam, chilled water, cooling water, compressed air and power supply.

Q11: What auxiliary units can be supplied?

Milk reception tank, raw milk storage tank, batching tank, homogenizer, sterilizer, filler, packaging machine, CIP station.

Q12: Is it a turnkey solution?

Yes, full turnkey service including process design, manufacturing, installation guidance, commissioning and operator training

Q13: What information is needed to design a dairy water treatment system?

Please provide the water source, a recent laboratory analysis, required treated-water flow, intended water uses, production schedule and estimated CIP or utility demand. If the dairy line is being designed at the same time, workshop layout and upstream/downstream process requirements should also be reviewed so the water system can be sized with the production line.

Start Your Project

Send Your Requirements

Our engineers will return a line configuration, equipment list and budgetary quotation.

  • Required hourly capacity (L/H or BPH) —
  • Dairy product type — Pasteurized milk / UHT milk / yogurt etc.
  • Package type and volume —
  • Raw milk specification and target shelf life —
  • Sterilization type & homogenization requirement —
  • Local voltage & frequency, Workshop size —
  • Available on-site utilities (steam, chilled water, compressed air) —
  • Raw water source, laboratory analysis & required process-water quality — Include the latest report if available —
  • Destination country for certification & electrical standard —

WhatsApp +86 136 9173 6867 · +86 138 2520 5960

Dairy Production Line Inquiry

YouTube